sale closed

Assets Formerly Used At Carlsberg Northampton

Assets Formerly Used At Carlsberg Northampton

Location: Professionally dismantled and stored in warehouse in UK
All details are for guidance only, and subject to confirmation.

Krones Sander-Hansen Double-deck Pasteuriser

Immediately available.
Make: Krones Sander-Hansen
Model: PB 17.9-504-42
Zones: 11
Voltage: 400V – Frequency 50Hz
Made in: 2000 – Refurbished and upgraded in 2014
Capacity glass: around 54,000 bph / 330 and 275ml bottles – can also process cans.
Dimensions:  Length 22,336m x width 6,805m x height: 3,300m

Upgraded in 2014 with new belts with the more energy-efficient Marathon Belt and PU Control Upgrade from CPU¹ to CPU³. The cost of the Pasteuriser Control Upgrade accompanied with the Belt Replacement costs was £354,500 Sterling (420,000 Euros) in 2014.

Complete stainless steel.

Including:

  • In-feed and out-feed conveyors
  • Heat exchanger
  • Cooling tower

 

Upgrade from CPU¹ to CPU³ in 2014
Including the following works done in 2014

  • In conjunction with Siemens PLC periphery S7 including: CPU³ software and control,

  • 2 Siemens industrial PCs

  • Software licences for CPU³ and Windows XPBOX

  • Soft PLC WinAC software

  • Interface for remote periphery (I/O cards) – CP5613

  • 15” colour monitor with touch function

  • Monitor power supply 24 V / 10 A

  • Connecting cable, keyboard and mouse

  • Uninterruptible power supply 800 VA/ 560W

  • PU – Editor Software for online product data changes

  • Electrical documents for the change parts

  • New accurate temperature sensors for each zone along with new temperature sensors for chess

  • New auto boil-out function in conjunction with HPHW shut-off valve to protect shell and tube heat exchanger

  • Extended drain function for auto drain of the pasteuriser

  • Modification to the HPHW system to accommodate new shut off valve, to include:

  • To reroute the existing 4”nb HTHW supply using 4”nb SCH40 A106 high-temperature carbon steel material and install a free issue flanged stop valve

  • New gasket bolts to suit pressure and temperature

  • 2 new pressure gauges, gauge valves and U siphon tubes

  • To pressure test the pipework on the bench to 27 bar using cold water prior to fit-up

  • Insulate the new pipework and provide a flexible insulation mate for the new valve

  • All redundant and obsolete software/hardware/field-wiring removed.