Complete 215MW CCGT Power Station For Relocation

Featured Items:

• 2 x  72MW GE 6FA Dual Fuel Gas Turbines, Generator and Transformer (11.5kV/132kV)

• 1 x  71MW Alstom Two Cylinder HP and LP Steam Turbine, Generator and Transformer (11.5kV/132kV)

• 2x Stork dual pressure 107 bar @ 536 C, & 9.6 bar @ 240 C – unfired HRSG’s

• Gas reception facility/reducing station

• Water Treatment Plant

• Air cooled condenser

• 1MW Diesel generator, Back up batteries

• The Plant is also designed to supply up to 28kg/sec of steam in CHP operation

• The plant is capable of frequency response in both gas and liquid fuel operation

• The Gas Turbines have been fully maintained under a Manufacturers Maintenance Programme with GE

• The plant benefits from having two major inspections within the last three years. The plant is to be sold as a complete asset with an option for a turnkey relocation contract with the seller being responsible for:

– Dismantling

– Re-assembly

– Commissioning

– On site training

– Six-year maintenance programme.

• The plant is being sold with $9M of spares including a complete hot path replacement.